Yokogawa R-V400D-02010

Size 18.01 to 20.0 inches

Open Market / 45 Days

Yokogawa R-DTW200-025TW4

Tapered, Welded, 1 inch Pipe Size, (Socket Weld Thermowell), U = 2.5 inch

Open Market / 45 Days

Yokogawa HFL2-A

Silicone 200-10 -40 to 400 Deg F

Open Market / 45 Days

Yokogawa EJAC81E-T04

Pressure test/leak test certificate Test pressure:50 kPa(200 inH2O)

Open Market / 45 Days

Yokogawa R-V400D-02015

Size 18.01 to 20.0 inches

Open Market / 45 Days

Yokogawa R-DTW200-135TW4

Tapered, Welded, 1 inch Pipe Size, (Socket Weld Thermowell), U = 13.5 inch

Open Market / 45 Days

Yokogawa R-DTW200-100RF6

Reduced Tip, 1.5 inch (Flanged Thermowell, Raised Face) U = 10.0 inch

Open Market / 45 Days

Yokogawa R-DTW200-WT30

3.0 Inch Lag On 316SS Thermowell Only

Open Market / 45 Days

Yokogawa R-DTW200-100TF6

Tapered, 1.5 inch (Flanged Thermowell, Raised Face), U = 10.0 inch

Open Market / 45 Days

Yokogawa R-DTW200-105RT4

Reduced Tip, 1 inch NPT Threads, (Threaded Thermowell), U = 10.5 inch

Open Market / 45 Days

Yokogawa R-DTW200-135RT4

Reduced Tip, 1 inch NPT Threads, (Threaded Thermowell), U = 13.5 inch

Open Market / 45 Days

Yokogawa R-DTW200-105RW3

Reduced Tip, Welded, 3/4 inch Pipe Size, (Socket Weld Thermowell), U = 10.5...

Open Market / 45 Days

Yokogawa R-DTW200-135TT4

Tapered, 1 Inch NPT Threads, (Threaded Thermowell), U = 13.5 inch

Open Market / 45 Days

Yokogawa R-DTW200-105RT3

Reduced Tip, 3/4 inch NPT Threads, (Threaded Thermowell), U = 10.5 inch

Open Market / 45 Days

Yokogawa R-DTW200-N

Threaded or Socket Weld

Open Market / 45 Days

Yokogawa R-DTW200-WT60

6.0 Inch Lag On 316SS Thermowell Only

Open Market / 45 Days

Yokogawa HFL2-L

DC 200-350(Food Grade) 0 to 572 Deg F

Open Market / 45 Days

Yokogawa R-DTW200-100TF4

Tapered, 1 inch (Flanged Thermowell, Raised Face), U = 10.0 inch

Open Market / 45 Days

Yokogawa R-DTW200-135RT2

Reduced Tip, 1/2 inch NPT Threads, (Threaded Thermowell), U = 13.5 inch

Open Market / 45 Days

Yokogawa C80FE-8

Length(X2)=200 +/- 0.8 mm

Open Market / 45 Days

Yokogawa R-DTW200-135TT2

Tapered, 1/2 inch NPT Threads, (Threaded Thermowell), U = 13.5 inch

Open Market / 45 Days

Yokogawa EJA510E-T05

Pressure test/leak test certificate Test pressure:200 kPa(800 inH2O)

Open Market / 45 Days

Yokogawa R-DTW200-135RT3

Reduced Tip, 3/4 inch NPT Threads, (Threaded Thermowell), U = 13.5 inch

Open Market / 45 Days

Yokogawa R-DTW200-LT11

#6 Spade Lugs On Single Element Sensors

Open Market / 45 Days

Yokogawa R-DTW200-100TF8

Tapered, 2 inch (Flanged Thermowell, Raised Face), U = 10.0 inch

Open Market / 45 Days

Yokogawa R-DTW200-MT2

304 SS Tag

Open Market / 45 Days

Yokogawa R-DTW200-NN

No Extension

Open Market / 45 Days

Yokogawa R-DTW200-NNN

No Connection Head

Open Market / 45 Days

Yokogawa R-DTW200-135RW4

Reduced Tip, Welded, 1 inch Pipe Size, (Socket Weld Thermowell), U = 13.5...

Open Market / 45 Days

Yokogawa R-DTW200-135TT3

Tapered, 3/4 inch NPT Threads, (Threaded Thermowell), U = 13.5 inch

Open Market / 45 Days

Yokogawa R-DTW200-105RT2

Reduced Tip, 1/2 inch NPT Threads, (Threaded Thermowell), U = 10.5 inch

Open Market / 45 Days

Yokogawa R-V400S-02015

Size 18.01 to 20.0 inches

Open Market / 45 Days

Yokogawa M1263ZX

FLXA202 Panel Mounting Bracket Replacing EXA200 and 202s

Open Market / 45 Days

Yokogawa AXW125-L200

Signal and Excitation Cable Length(200m)

Open Market / 45 Days

Yokogawa R-DTW200-L

Spring Loaded Hex Fitting

Open Market / 45 Days

Yokogawa M1263MD

Ball valve 316SS 2.0 inch FNPT Process Connection (/BS200 option)

Open Market / 45 Days

Yokogawa M1263YG

PH18.O-Ring Kalrez 6375; 20.0 x 2.5 (QTY1)

Open Market / 45 Days

Yokogawa EJX310A-T04

Pressure test/leak test certificate Test pressure:50 kPa(200 inH2O)

Open Market / 45 Days

Yokogawa R-V400S-02010

Size 18.01 to 20.0 inches

Open Market / 45 Days

Yokogawa M1263YB

PH18.O-Ring FDA-Approved EPDM 20.0 x 2.5 (QTY1) (Replaced K1500BJ)

Open Market / 45 Days

Yokogawa K1525YD

316SS 2.0 Flange Adapter with drains, NO BALL VALVE INCLUDED (/FA200 option),...

Open Market / 45 Days

Yokogawa K1525YV

Stainless steel 2" NPT Process adapter to work with the FU20 sensor...

Open Market / 45 Days

Yokogawa AXW350-L200

Signal and Excitation Cable Length(200m)

Open Market / 45 Days

Yokogawa R-V100-02010

Size 18.01 to 20.0 inches

Open Market / 45 Days

Yokogawa K1525YW

316SS 2" Flange Adapter with drains, to work with the FU20 sensor. NO BALL...

Open Market / 45 Days

Yokogawa K1541EM

Stainless Steel 2 in NPT ptocess adapter (/SA200 option)

Open Market / 45 Days

Yokogawa TSD200-105

10.5 inch Immersion Length

Open Market / 45 Days

Yokogawa TSD200-110

11.0 inch Immersion Length

Open Market / 45 Days

Yokogawa TSD200-065

6.5 inch Immersion Length

Open Market / 45 Days

Yokogawa TSD200-080

8.0 inch Immersion Length

Open Market / 45 Days